summaryrefslogtreecommitdiff
path: root/ipc
diff options
context:
space:
mode:
authorRumen G. Bogdanovski <rumen@voicecho.com>2007-11-07 02:36:55 -0800
committerDavid S. Miller <davem@sunset.davemloft.net>2007-11-07 04:15:10 -0800
commitefac52762b1e3fe3035d29e82d8ee1aebc45e4a7 (patch)
tree3979958b12d4a3b326b657f52f960f013c6cb560 /ipc
parent1e356f9cdfa885c78791d5d6e5d2baef22f01853 (diff)
[IPVS]: Synchronize closing of Connections
This patch makes the master daemon to sync the connection when it is about to close. This makes the connections on the backup to close or timeout according their state. Before the sync was performed only if the connection is in ESTABLISHED state which always made the connections to timeout in the hard coded 3 minutes. However the Andy Gospodarek's patch ([IPVS]: use proper timeout instead of fixed value) effectively did nothing more than increasing this to 15 minutes (Established state timeout). So this patch makes use of proper timeout since it syncs the connections on status changes to FIN_WAIT (2min timeout) and CLOSE (10sec timeout). However if the backup misses CLOSE hopefully it did not miss FIN_WAIT. Otherwise we will just have to wait for the ESTABLISHED state timeout. As it is without this patch. This way the number of the hanging connections on the backup is kept to minimum. And very few of them will be left to timeout with a long timeout. This is important if we want to make use of the fix for the real server overcommit on master/backup fail-over. Signed-off-by: Rumen G. Bogdanovski <rumen@voicecho.com> Signed-off-by: Simon Horman <horms@verge.net.au> Signed-off-by: David S. Miller <davem@davemloft.net>
Diffstat (limited to 'ipc')
0 files changed, 0 insertions, 0 deletions