diff options
author | Jiri Olsa <jolsa@redhat.com> | 2012-05-23 13:13:02 +0200 |
---|---|---|
committer | Ingo Molnar <mingo@kernel.org> | 2012-05-23 17:40:51 +0200 |
commit | ab0cce560ef177bdc7a8f73e9962be9d829a7b2c (patch) | |
tree | d9875b21c42862201624eb7d9ea2c36f4ea4035d /kernel | |
parent | 26252ea675663d1bc6747125fcaa2b7cc4ed8a03 (diff) |
Revert "sched, perf: Use a single callback into the scheduler"
This reverts commit cb04ff9ac424 ("sched, perf: Use a single
callback into the scheduler").
Before this change was introduced, the process switch worked
like this (wrt. to perf event schedule):
schedule (prev, next)
- schedule out all perf events for prev
- switch to next
- schedule in all perf events for current (next)
After the commit, the process switch looks like:
schedule (prev, next)
- schedule out all perf events for prev
- schedule in all perf events for (next)
- switch to next
The problem is, that after we schedule perf events in, the pmu
is enabled and we can receive events even before we make the
switch to next - so "current" still being prev process (event
SAMPLE data are filled based on the value of the "current"
process).
Thats exactly what we see for test__PERF_RECORD test. We receive
SAMPLES with PID of the process that our tracee is scheduled
from.
Discussed with Peter Zijlstra:
> Bah!, yeah I guess reverting is the right thing for now. Sad
> though.
>
> So by having the two hooks we have a black-spot between them
> where we receive no events at all, this black-spot covers the
> hand-over of current and we thus don't receive the 'wrong'
> events.
>
> I rather liked we could do away with both that black-spot and
> clean up the code a little, but apparently people rely on it.
Signed-off-by: Jiri Olsa <jolsa@redhat.com>
Acked-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Cc: acme@redhat.com
Cc: paulus@samba.org
Cc: cjashfor@linux.vnet.ibm.com
Cc: fweisbec@gmail.com
Cc: eranian@google.com
Link: http://lkml.kernel.org/r/20120523111302.GC1638@m.brq.redhat.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'kernel')
-rw-r--r-- | kernel/events/core.c | 14 | ||||
-rw-r--r-- | kernel/sched/core.c | 9 |
2 files changed, 12 insertions, 11 deletions
diff --git a/kernel/events/core.c b/kernel/events/core.c index 91a445925855..5b06cbbf6931 100644 --- a/kernel/events/core.c +++ b/kernel/events/core.c @@ -2039,8 +2039,8 @@ static void perf_event_context_sched_out(struct task_struct *task, int ctxn, * accessing the event control register. If a NMI hits, then it will * not restart the event. */ -static void __perf_event_task_sched_out(struct task_struct *task, - struct task_struct *next) +void __perf_event_task_sched_out(struct task_struct *task, + struct task_struct *next) { int ctxn; @@ -2279,8 +2279,8 @@ static void perf_branch_stack_sched_in(struct task_struct *prev, * accessing the event control register. If a NMI hits, then it will * keep the event running. */ -static void __perf_event_task_sched_in(struct task_struct *prev, - struct task_struct *task) +void __perf_event_task_sched_in(struct task_struct *prev, + struct task_struct *task) { struct perf_event_context *ctx; int ctxn; @@ -2305,12 +2305,6 @@ static void __perf_event_task_sched_in(struct task_struct *prev, perf_branch_stack_sched_in(prev, task); } -void __perf_event_task_sched(struct task_struct *prev, struct task_struct *next) -{ - __perf_event_task_sched_out(prev, next); - __perf_event_task_sched_in(prev, next); -} - static u64 perf_calculate_period(struct perf_event *event, u64 nsec, u64 count) { u64 frequency = event->attr.sample_freq; diff --git a/kernel/sched/core.c b/kernel/sched/core.c index 13c38837f2cd..0533a688ce22 100644 --- a/kernel/sched/core.c +++ b/kernel/sched/core.c @@ -1913,7 +1913,7 @@ prepare_task_switch(struct rq *rq, struct task_struct *prev, struct task_struct *next) { sched_info_switch(prev, next); - perf_event_task_sched(prev, next); + perf_event_task_sched_out(prev, next); fire_sched_out_preempt_notifiers(prev, next); prepare_lock_switch(rq, next); prepare_arch_switch(next); @@ -1956,6 +1956,13 @@ static void finish_task_switch(struct rq *rq, struct task_struct *prev) */ prev_state = prev->state; finish_arch_switch(prev); +#ifdef __ARCH_WANT_INTERRUPTS_ON_CTXSW + local_irq_disable(); +#endif /* __ARCH_WANT_INTERRUPTS_ON_CTXSW */ + perf_event_task_sched_in(prev, current); +#ifdef __ARCH_WANT_INTERRUPTS_ON_CTXSW + local_irq_enable(); +#endif /* __ARCH_WANT_INTERRUPTS_ON_CTXSW */ finish_lock_switch(rq, prev); finish_arch_post_lock_switch(); |