summaryrefslogtreecommitdiff
path: root/kernel
diff options
context:
space:
mode:
authorJiri Olsa <jolsa@redhat.com>2012-05-23 13:13:02 +0200
committerIngo Molnar <mingo@kernel.org>2012-05-23 17:40:51 +0200
commitab0cce560ef177bdc7a8f73e9962be9d829a7b2c (patch)
treed9875b21c42862201624eb7d9ea2c36f4ea4035d /kernel
parent26252ea675663d1bc6747125fcaa2b7cc4ed8a03 (diff)
Revert "sched, perf: Use a single callback into the scheduler"
This reverts commit cb04ff9ac424 ("sched, perf: Use a single callback into the scheduler"). Before this change was introduced, the process switch worked like this (wrt. to perf event schedule): schedule (prev, next) - schedule out all perf events for prev - switch to next - schedule in all perf events for current (next) After the commit, the process switch looks like: schedule (prev, next) - schedule out all perf events for prev - schedule in all perf events for (next) - switch to next The problem is, that after we schedule perf events in, the pmu is enabled and we can receive events even before we make the switch to next - so "current" still being prev process (event SAMPLE data are filled based on the value of the "current" process). Thats exactly what we see for test__PERF_RECORD test. We receive SAMPLES with PID of the process that our tracee is scheduled from. Discussed with Peter Zijlstra: > Bah!, yeah I guess reverting is the right thing for now. Sad > though. > > So by having the two hooks we have a black-spot between them > where we receive no events at all, this black-spot covers the > hand-over of current and we thus don't receive the 'wrong' > events. > > I rather liked we could do away with both that black-spot and > clean up the code a little, but apparently people rely on it. Signed-off-by: Jiri Olsa <jolsa@redhat.com> Acked-by: Peter Zijlstra <a.p.zijlstra@chello.nl> Cc: acme@redhat.com Cc: paulus@samba.org Cc: cjashfor@linux.vnet.ibm.com Cc: fweisbec@gmail.com Cc: eranian@google.com Link: http://lkml.kernel.org/r/20120523111302.GC1638@m.brq.redhat.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'kernel')
-rw-r--r--kernel/events/core.c14
-rw-r--r--kernel/sched/core.c9
2 files changed, 12 insertions, 11 deletions
diff --git a/kernel/events/core.c b/kernel/events/core.c
index 91a445925855..5b06cbbf6931 100644
--- a/kernel/events/core.c
+++ b/kernel/events/core.c
@@ -2039,8 +2039,8 @@ static void perf_event_context_sched_out(struct task_struct *task, int ctxn,
* accessing the event control register. If a NMI hits, then it will
* not restart the event.
*/
-static void __perf_event_task_sched_out(struct task_struct *task,
- struct task_struct *next)
+void __perf_event_task_sched_out(struct task_struct *task,
+ struct task_struct *next)
{
int ctxn;
@@ -2279,8 +2279,8 @@ static void perf_branch_stack_sched_in(struct task_struct *prev,
* accessing the event control register. If a NMI hits, then it will
* keep the event running.
*/
-static void __perf_event_task_sched_in(struct task_struct *prev,
- struct task_struct *task)
+void __perf_event_task_sched_in(struct task_struct *prev,
+ struct task_struct *task)
{
struct perf_event_context *ctx;
int ctxn;
@@ -2305,12 +2305,6 @@ static void __perf_event_task_sched_in(struct task_struct *prev,
perf_branch_stack_sched_in(prev, task);
}
-void __perf_event_task_sched(struct task_struct *prev, struct task_struct *next)
-{
- __perf_event_task_sched_out(prev, next);
- __perf_event_task_sched_in(prev, next);
-}
-
static u64 perf_calculate_period(struct perf_event *event, u64 nsec, u64 count)
{
u64 frequency = event->attr.sample_freq;
diff --git a/kernel/sched/core.c b/kernel/sched/core.c
index 13c38837f2cd..0533a688ce22 100644
--- a/kernel/sched/core.c
+++ b/kernel/sched/core.c
@@ -1913,7 +1913,7 @@ prepare_task_switch(struct rq *rq, struct task_struct *prev,
struct task_struct *next)
{
sched_info_switch(prev, next);
- perf_event_task_sched(prev, next);
+ perf_event_task_sched_out(prev, next);
fire_sched_out_preempt_notifiers(prev, next);
prepare_lock_switch(rq, next);
prepare_arch_switch(next);
@@ -1956,6 +1956,13 @@ static void finish_task_switch(struct rq *rq, struct task_struct *prev)
*/
prev_state = prev->state;
finish_arch_switch(prev);
+#ifdef __ARCH_WANT_INTERRUPTS_ON_CTXSW
+ local_irq_disable();
+#endif /* __ARCH_WANT_INTERRUPTS_ON_CTXSW */
+ perf_event_task_sched_in(prev, current);
+#ifdef __ARCH_WANT_INTERRUPTS_ON_CTXSW
+ local_irq_enable();
+#endif /* __ARCH_WANT_INTERRUPTS_ON_CTXSW */
finish_lock_switch(rq, prev);
finish_arch_post_lock_switch();