summaryrefslogtreecommitdiff
path: root/kernel/rcu
diff options
context:
space:
mode:
authorDaniel Bristot de Oliveira <bristot@redhat.com>2017-03-02 15:10:58 +0100
committerGreg Kroah-Hartman <gregkh@linuxfoundation.org>2017-12-20 10:04:55 +0100
commitca91884bcf7de730344ab13cbcaf4279e7fe38a7 (patch)
treef2b6358c8ecfbc1cd3c05d95a9e67bf2e7ab479f /kernel/rcu
parentcd0e18d2f24b58f0793f3c7af2d75def1daec8a2 (diff)
sched/deadline: Throttle a constrained deadline task activated after the deadline
[ Upstream commit df8eac8cafce7d086be3bd5cf5a838fa37594dfb ] During the activation, CBS checks if it can reuse the current task's runtime and period. If the deadline of the task is in the past, CBS cannot use the runtime, and so it replenishes the task. This rule works fine for implicit deadline tasks (deadline == period), and the CBS was designed for implicit deadline tasks. However, a task with constrained deadline (deadine < period) might be awakened after the deadline, but before the next period. In this case, replenishing the task would allow it to run for runtime / deadline. As in this case deadline < period, CBS enables a task to run for more than the runtime / period. In a very loaded system, this can cause a domino effect, making other tasks miss their deadlines. To avoid this problem, in the activation of a constrained deadline task after the deadline but before the next period, throttle the task and set the replenishing timer to the begin of the next period, unless it is boosted. Reproducer: --------------- %< --------------- int main (int argc, char **argv) { int ret; int flags = 0; unsigned long l = 0; struct timespec ts; struct sched_attr attr; memset(&attr, 0, sizeof(attr)); attr.size = sizeof(attr); attr.sched_policy = SCHED_DEADLINE; attr.sched_runtime = 2 * 1000 * 1000; /* 2 ms */ attr.sched_deadline = 2 * 1000 * 1000; /* 2 ms */ attr.sched_period = 2 * 1000 * 1000 * 1000; /* 2 s */ ts.tv_sec = 0; ts.tv_nsec = 2000 * 1000; /* 2 ms */ ret = sched_setattr(0, &attr, flags); if (ret < 0) { perror("sched_setattr"); exit(-1); } for(;;) { /* XXX: you may need to adjust the loop */ for (l = 0; l < 150000; l++); /* * The ideia is to go to sleep right before the deadline * and then wake up before the next period to receive * a new replenishment. */ nanosleep(&ts, NULL); } exit(0); } --------------- >% --------------- On my box, this reproducer uses almost 50% of the CPU time, which is obviously wrong for a task with 2/2000 reservation. Signed-off-by: Daniel Bristot de Oliveira <bristot@redhat.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Juri Lelli <juri.lelli@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Luca Abeni <luca.abeni@santannapisa.it> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Romulo Silva de Oliveira <romulo.deoliveira@ufsc.br> Cc: Steven Rostedt <rostedt@goodmis.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: Tommaso Cucinotta <tommaso.cucinotta@sssup.it> Link: http://lkml.kernel.org/r/edf58354e01db46bf42df8d2dd32418833f68c89.1488392936.git.bristot@redhat.com Signed-off-by: Ingo Molnar <mingo@kernel.org> Signed-off-by: Sasha Levin <alexander.levin@verizon.com> Signed-off-by: Greg Kroah-Hartman <gregkh@linuxfoundation.org>
Diffstat (limited to 'kernel/rcu')
0 files changed, 0 insertions, 0 deletions